Restaurants & cafés, Riyadh

The kitchen extract decides the opening night.

Design, kitchen extract, drainage and civil defence on one contract. One team answers for all of it.

How we work
Who this page is for
An owner opening a first restaurant or café, with the opening night already on the calendar
A brand opening in a mall that wants an approval file before the first cut
A group opening several branches built to one specification, and read as one
What the contract covers

What we draw, we build. What we do not build, we answer for.

Design that meets municipal and health requirementsour team
Kitchen extract and ductworkour team
Gas supply and its approvalsour team
Civil defence: suppression, alarm and exitsour team
Drainage and grease trapsour team
HVAC and acousticsour team
Washable floors and wallsour team
Joinery, bar and banquettesour team
Baladi trade licencewe manage
The usual programme
13–15weeks for a 150–400 m² restaurant, from the visit to opening.

Weeks from signature, when the design is ours and the licences are new.

What usually stretches it
Landlord or mall approval running late+2–4 weeks
A design change after pricing+1–3 weeks
Civil defence inspection+1–2 weeks
Imported supply+4–8 weeks

Fixed price after design, exclusions in writing, changes only by a signed change order.

What we commit to

The licences, in order

Six licences. Each one has a name beside it.

01Commercial registrationYou do
02Landlord or mall approvalYou do
03Renovation permit, if requiredThe engineering office
04Civil defence safetyWe do
05Balady licenceWe do
06Health requirementsWe do
A café ceiling, before it is closed. Riyadh

See the delivered work

Questions we are asked
Do you install the kitchen extract yourselves?

Yes. Our own HVAC team installs the extract, the ductwork and every piece of equipment tied to it. It is the one system that most often fails when a contractor hands it to a subcontractor.

Do you carry the civil defence licence through?

Yes, inside the programme, not after it. Our fire team prepares the technical report and the installation, and you know who signs, and when.

How long does a 250 m² restaurant take?

13–15 weeks from signature to handover, when the design is ours and the licences are new. The interactive timeline dates your own project.

Can we open in stages?

Yes. The dining room first and the terrace later, for instance, once the safety requirements are complete for the part that opens.

Who answers you
Project Manager. One number, and a report every ThursdayName [ ]
Illustrative image
How we work with you

We reply the same working day.

We visit the site within two working days.

The price is fixed after design, and the exclusions are in writing.

12 months of defects liability, 24 for MEP, and a maintenance team after handover.

Illustrative image

Send the plan. In two working days, you have a programme.

Or book a site visit

Start your project

Send the plan or call. In two working days, you have an outline programme.

WhatsAppBook a visitwithin two working days