
What we build ourselves, and where that stops.
33 people on site. Five trades under one contract, not five contractors under five.
Built by our own team, and counted project by project.
Build
on 5 of 6 projectsPartitions, ceilings, civil works, and the site run day by day.
Nobody waits for another contractor to start. Nothing that was closed gets opened again.

MEP
on 5 of 6 projectsPower, HVAC, ventilation, plumbing and drainage — and the kitchen extract in restaurants.
The trade that fails most often on a subcontract. Here it is one responsibility, from design to commissioning.

Fire and alarm
on 1 of 6 projectsSprinklers, alarm, exits and the technical civil defence file.
The inspection holds no surprises. Whoever installed the system stands in front of the inspector.

Joinery
on 2 of 6 projectsThe bar, the banquettes, display units, fixed furniture and room wardrobes.
Measured on site, not off the drawing. An adjustment takes a day, not a fortnight.

Finishes
on 4 of 6 projectsFloors, walls, paint and the last details your customer actually sees.
The last 5% is what usually delays an opening. Our own team finishes it, not whoever happens to be free.


The joinery workshop
The other half, in writing.
The design team sits with the build team, so nothing is drawn that cannot be built. If another practice drew it at your request, the responsibility is still ours.
We prepare the files and chase civil defence and the municipality. The signature is the authority's, which is why its duration sits inside the programme, not outside it.
Ordered early and shown in the programme. We do not promise shipping we do not control.
No blame passed between contractors. Whoever built it fixes it.
The trades overlap on our own schedule. Nobody waits on anybody at the cost of your date.
No subcontractor margin on top of ours. What we commit to
Your room